Skip to main content

Guide

Construction waste factors by material: how much extra to order, with sources

Waste percentages for twelve materials from the industry bodies that publish them, what 309 real estimate workbooks actually use, and a calculator that rounds to order units.

By the MassBid Estimation team · Reviewed by a senior estimator with 10+ years of experience · Published · Updated

In short

A waste factor is the percentage added to a net takeoff quantity to cover cutting, breakage, spillage and buying in whole units. The published figures are 4 to 10 percent for ready-mix concrete (NRMCA), at least 5 percent for brick and 15 to 25 percent for mortar (Brick Industry Association), 5 percent for concrete block (NCMA) and 10 to 15 percent for asphalt shingles (Owens Corning). Drywall, lumber, sheathing, rebar and most other materials have no published standard; 10 percent is the common default, and it is the rate on 92 percent of the 11,026 line items carrying waste in 309 MassBid estimate workbooks. Waste goes on material, never on labor.

Formula
Order quantity = net quantity × (1 + waste %), rounded up to order units
Ready-mix concrete
4 to 10% over plan (NRMCA CIP 8 and CIP 31)
Brick / mortar
At least 5% / 15 to 25% (BIA Technical Note 10)
Concrete block
5%: 119 units per 100 sq ft of wall (NCMA TEK 4-2A)
Asphalt shingles
10 to 15%, underlayment too (Owens Corning)
No published standard
Drywall, lumber, sheathing, rebar: 10% is the common default
Labor
No waste: labor is priced on the net quantity

What a waste factor is, and what it is not

A takeoff measures the net quantity: the square feet of wall, the cubic yards in the forms, the number of blocks in the elevation. Material never goes in exactly at that quantity. It is cut at openings and corners, broken in handling, spilled, over-poured into uneven subgrade, and sold only in whole sheets, bundles, boxes and truckloads. The waste factor is the percentage that turns the net quantity into the quantity to buy.

Four other allowances get confused with it, and each belongs on a different line of the estimate:

Waste factor compared with overage, attic stock, contingency and soil swell
AllowanceWhat it coversWhere it goes
Waste factorCuts, breakage, spillage and offcuts during installationOn each material line, as a percentage of the net quantity
Rounding to order unitsBuying whole sheets, bundles, boxes or loadsAfter waste: round the gross quantity up
Attic stockSpare material left with the owner for future repairs, often required by the specificationA separate line, at the quantity the specification calls for
ContingencyUnknowns in scope, design or priceOne percentage on the whole estimate, after markups
Swell and shrinkageSoil that bulks when dug and compacts when placedOn earthwork volumes, from the geotechnical report, not as waste

Waste factors by material

Only a few industry bodies publish a waste figure, so the table shows who said what. Where no association or manufacturer publishes one, it says so, and the rate shown is common estimating practice rather than a standard. Retailer figures are marked as retailer figures.

Waste factors by construction material, when to go higher, and the source of each figure
MaterialWasteGo higher forSource
Ready-mix concrete4 to 10%Footings dug in soil, sporadic small pours, elevated slabs on deflecting forms, granular fillNRMCA CIP 8 and CIP 31
Concrete block (CMU)5%Many openings, pilasters and cornersNCMA TEK 4-2A
BrickAt least 5%Job conditions or experience, per BIA; header bonds add brick through a separate bond correction, not wasteBIA Technical Note 10
Mortar15 to 25%Job conditions or experience, per BIABIA Technical Note 10
Masonry groutNo % publishedBucketed rather than pumped grout, small projectsNCMA TEK 4-2A
Asphalt shingles10 to 15%Hips, valleys and dormers; JLC adds one square per 100 linear feet of hips, valleys, ridges and starterOwens Corning; JLC
Roof underlayment10 to 15%Same as the shingles it goes underOwens Corning
Floor tile, straight lay10%Small rooms, many cornersTile retailer; Daltile recommends 10% extra as attic stock
Floor tile, diagonal or herringbone15 to 20%Chevron and large-format tile; one tile maker recommends 20 to 35%Tile retailers
Carpet5 to 10%Seams, pattern match, stairsFlooring retailer
Drywall10% (no standard)Short walls, many openings, stairwellsCommon practice
Framing lumber and sheathing10% (no standard)Complex roofs and wallsCommon practice
Rebar10% (no standard)Short bars; measure laps and hooks as length, not as wasteCommon practice
Paint, insulation, wire, pipe, duct10% (no standard)Many short runs and fittingsCommon practice
Published figures are quoted from the documents listed under Sources. Tile and carpet figures come from retailers and a tile maker, and they disagree with each other, which is why the ranges are wide. Where the specification or the client sets a rate, that rate replaces this table.

What 309 real estimates actually use

Published ranges say what is reasonable. To see what estimators actually enter, we read the waste column of 309 takeoff and estimate workbooks we have delivered, across every trade, and counted each distinct line item once.

Waste rates on line items in 309 MassBid estimate and takeoff workbooks
Waste rateLine itemsShare of lines carrying waste
10%10,15992.1%
5%7266.6%
7%1411.3%
0%19,588Not counted above: labor, counted items and items bought to exact size
11,026 line items carry a waste rate. The 0% lines are mostly labor, and items counted or bought to exact size, such as doors, fixtures and equipment.

Three things stand out:

  • 10 percent is the default in practice for almost every material, including those with a lower published figure, such as concrete and block. A flat default is simple to check and errs on the side of not running short.
  • 5 percent appears where the client set a lower rate. Contractors who track their own waste often run tighter than 10 percent, and the estimate should use their number.
  • More line items carry no waste than carry it. Labor, counted items and equipment never get a waste factor, and applying one across a whole estimate overstates it.

How to apply a waste factor, with worked examples

  • Take off the net quantity from the drawings first, with no allowance built in.
  • Apply waste to each material line, not to the estimate total, because the right rate differs by material.
  • Use the rate in the specification or the client's own rate when there is one; use the table above when there is not.
  • Round the gross quantity up to the unit the material is sold in: sheets, bundles, boxes, bags or yards.
  • Leave labor on the net quantity. Crews install the net area; the offcuts are already in the production rate.
Worked examples of applying a waste factor and rounding to order units
MaterialNet quantityWasteWith wasteOrder
Drywall, 4 × 8 sheets3,200 sq ft of board10%3,520 sq ft110 sheets
Ready-mix, 40 × 30 ft slab, 4 in.14.81 cu yd5%15.55 cu yd15.75 cu yd
Modular brick, 1,000 sq ft of wall6,750 brick (675 per 100 sq ft)5%7,088 brick7,088 brick
Mortar for the same wall55 cu ft (5.5 per 100 sq ft)20%66 cu ft66 cu ft
Concrete block, 1,000 sq ft of wall1,125 blocks (112.5 per 100 sq ft)5%1,181.25 blocks1,182 blocks
Architectural shingles2,400 sq ft (24 squares)10%26.4 squares80 bundles
Brick and mortar quantities are from BIA Technical Note 10, Table 4, for modular brick with 3/8 in. joints in running bond. Block count is 100 sq ft ÷ 8/9 sq ft per unit face. Shingles at three bundles per square.

Rounding matters as much as the percentage on small quantities. Ten percent of 14 sheets is 1.4 sheets, but the order is still a whole number, and on a ready-mix order the last two or three loads should be checked against what is left to pour, as NRMCA recommends, rather than ordered blind.

Waste factor calculator

Pick a material to load its starting rate and order unit, enter the net quantity from the takeoff, and change the waste percentage to your own if you have one. It returns the gross quantity and the number of order units to buy.

Waste factor calculator

Net quantity
3,200.0 sq ft of board
With waste
3,520.0 sq ft of board
Waste allowance
320.0 sq ft of board
Order (4 × 8 sheets)
110

Order quantity = net quantity × (1 + waste %) ÷ order unit size, rounded up to whole order units. The starting rate changes with the material you pick; use the client's or the specification's rate when there is one. Waste goes on material only, never on labor hours, which are priced on the net quantity.

When to use more waste, and when less

Job conditions that raise or lower the waste factor
Use more waste whenUse less waste when
Rooms and walls are small, with many corners and openingsAreas are large, open and rectangular
The layout is diagonal, herringbone or pattern-matchedMaterial is laid straight, in a running pattern
Pours are small and scattered, or dug in soilWork is repetitive, such as slip-form or repeated floors
Material is fragile, or handled several timesMaterial is delivered to the point of use
The crew or the product is newThe contractor tracks its own waste and it runs low
Pieces are bought in long lengths and cut shortMaterial is cut to length or fabricated to the drawings

Common waste factor mistakes

  • Applying one percentage to the whole estimate, labor and equipment included.
  • Counting the same allowance twice: measuring rebar laps as length and then adding laps again as waste, or adding hip and ridge shingles and a full complex-roof percentage on top.
  • Using 10 percent on mortar, where BIA's figure is 15 to 25 percent.
  • Mixing up waste and attic stock, so the owner's spare tile is consumed as waste.
  • Not rounding up to whole order units, or rounding each room instead of the total.
  • Ignoring the client's own rate, which reflects how their crews actually install.

How waste shows up in our takeoffs

Every MassBid takeoff shows the net quantity, the waste percentage and the quantity with waste in separate columns, so you can see and change the allowance on every line. We use your rates when you send them and 10 percent where you do not, and the workbook recalculates when you change one. See how we estimate, the quantity takeoff guide, or send the drawings for a free quote.

Common questions

The percentage added to a net takeoff quantity to cover cutting, breakage, spillage and buying in whole units. Order quantity = net quantity × (1 + waste percentage), rounded up to the unit the material is sold in.

There is no single standard. Published figures are 4 to 10% for ready-mix concrete (NRMCA), at least 5% for brick and 15 to 25% for mortar (BIA), 5% for concrete block (NCMA) and 10 to 15% for shingles (Owens Corning). For other materials 10% is the common default; it is the rate on 92% of the line items carrying waste in 309 MassBid estimates.

4 to 10 percent over the volume calculated from plan dimensions, according to the National Ready Mixed Concrete Association, with more for footings in soil, sporadic small pours and elevated slabs.

No industry body publishes one; 10 percent is common practice, with more for short walls, many openings and stairwells. Round up to whole sheets after applying it.

About 10 percent for a straight lay and 15 to 20 percent for diagonal or herringbone, according to tile retailers; one tile maker recommends 20 to 35 percent, the most for large-format tile and complex layouts. Daltile recommends buying about 10 percent extra to keep as attic stock for repairs.

Owens Corning recommends adding 10 to 15 percent to shingles and underlayment, more on complex roofs. JLC also adds one square of shingles for every 100 linear feet of hips, valleys, ridges and starter.

The Brick Industry Association recommends adding at least 5 percent to net brick quantities and 15 to 25 percent to net mortar quantities, in Technical Note 10.

No. Labor is priced on the net quantity installed; the time spent on cuts and offcuts is already in the production rate. Waste goes on material only.

Waste is a percentage on each material line for cuts and breakage. Contingency is a single percentage on the whole estimate for unknowns in scope, design or price.

Sources

Send your plans, get an exact price

Free quote in about 20 minutes. Estimates typically in 24 to 48 hours, with free revisions.