For millwork shops and casework contractors
Millwork and casework estimating services
Every cabinet, desk, vanity and panel counted by its millwork tag from the plans and elevations, with its size and materials on the line, priced with fabrication and installation.
- Counted by ML tag
- Assemblies as specified
- 24 to 48 hours
In short
What millwork estimating covers
Millwork estimating is the takeoff and pricing of the architectural woodwork in a building: casework, reception desks, vanities, countertops, wall paneling, wood trim and handrails. Each assembly is counted by its millwork tag from the plans and interior elevations, with its size, materials and hardware from the details and specification, then priced with fabrication, delivery and installation. MassBid Estimation prepares millwork and casework takeoffs and estimates for millwork shops, casework installers and general contractors, typically in 24 to 48 hours.
MassBid Estimation is a construction estimating and takeoff company in Houston, Texas, founded in 2019. More than 20 in-house estimators have delivered over 1,000 takeoffs and estimates, and single projects start at $199.
- Scope
- Casework, desks, vanities, countertops, paneling and slat walls, closet systems, wood trim and handrails
- CSI section
- 06 41 00 architectural wood casework, 06 42 00 wood paneling, 06 46 00 wood trim, 12 36 00 countertops
- You send
- Plans, enlarged plans, interior elevations, millwork details, finish schedule, specification and addenda
- You get
- Marked-up sheets with every assembly tagged and counted, and a priced workbook with labor per line
- Turnaround
- 24 to 48 hours on most projects
- Checked by
- A separate QA team, twice on every job
- Coverage
- All 50 states, priced to the project's ZIP code
- Quote
- Free, usually back in about 20 minutes
Thursday · 9:10 PM
Twenty millwork tags, six room types, a brand product manual and a bid due Monday.
Millwork is drawn in pieces: a tag on the plan, an elevation on one sheet, the section on another, and the materials in a schedule or a product manual. The price depends on reading all of them together.
On a hotel or apartment job the same unit repeats dozens of times by room type, so one miscount on the unit plan is multiplied across the building, and the casework the owner buys directly has to come out of the number.
Four ways a millwork bid loses money
01 · The count
Guestroom casework counted once, not per room type
A drybar or vanity drawn on one unit plan appears in dozens of rooms of three or four types.
What changes
Each tag is counted per room type and multiplied by the rooms of that type, on its own line.
02 · The scope
Owner-purchased items priced anyway
Brand and owner procurement often supplies casegoods and furniture that are still drawn on the sheets.
What changes
Owner-furnished items are left out and listed in the notes, with the drawing note that says so.
03 · The assembly
A reception desk priced as a few cabinets
A front desk carries quartz ledges, metal mesh panels, lighting, grommets and equipment cutouts in its details.
What changes
Desks and specialty pieces are carried as complete assemblies, with the details that define them.
04 · The extras
Trim, rails and panels forgotten
Door trim, base, slat walls and wood handrails sit on other sheets and are easy to miss.
What changes
Trim and rails are measured in linear feet and slat walls by count and length, each on its own line.
Then and now
What has changed in millwork estimating
Millwork used to be priced from a cabinet count and a rate per linear foot. Four things have changed the takeoff.
Brand product manuals
Hotel and retail brands now specify millwork as tagged assemblies in a product manual, with the materials and finishes set.
Owner procurement
More casework and furniture is bought by the owner or brand and only installed by the contractor, or not at all.
Feature walls and slats
Wood slat walls and paneling have become a large share of lobby and amenity millwork.
Accessible variants
Accessible rooms carry their own vanity, drybar and kitchenette assemblies, each with a different tag and size.
Real millwork work
Sample millwork takeoffs on the drawings
Pages from a finished estimate for a four-story hotel in South Carolina. Each assembly is tagged and counted on the sheet, with its size and count in the legend. Title blocks, brand names and client details are removed. Click any page to enlarge.
Front desk
Front desk taken off as one assembly, from its elevations and sections
Protects you fromA custom desk priced as a few base cabinets.
Buffet
Buffet cabinetry counted by tag on the food-prep plan
Protects you fromCabinet runs measured from the plan alone.
Slat walls
Wood slat wall and coffee bar taken off from plans and elevations
Protects you fromFeature walls left for someone else.
Every estimate is built to the client's own specification, so yours may be laid out differently. To see a past project in your own trade, ask for an example. Examples are finished work for other projects, not an estimate of yours; for pricing on your own job, send the drawings for a free quote.
Estimator notes
Notes we wrote on this millwork estimate
Every takeoff ships with written notes: what was assumed, what was left out, and why. These are the notes from the hotel estimate above, with the brand name removed.
Exclusion
“Owner-purchased FF&E furniture is not covered, because it is bought through the brand's procurement program within the guestroom and bathroom.”
Why it mattersThe closets and drybars were drawn on the sheets but noted as purchasable through the brand. Pricing them would have put casework in the bid that the owner was buying.
Assumption
“Wooden trim at doors is covered on assumption; there is only one note regarding the trim.”
Why it matters3,738 linear feet of 1x4 door trim was carried on a single drawing note and marked as assumed, so the client could strike it if another trade had it.
Scope split
“Wooden doors are not covered, as they are considered part of another contractor. If they are required, kindly inform us.”
Why it mattersDoors usually belong to the door and hardware package. Stating it keeps them from being priced twice, or not at all.
Method
“Millwork is provided as a complete assembly in the specification, so the takeoff was done on an assembly basis.”
Why it mattersThe product manual defined each ML tag as a finished assembly, so each one is a single line with its size and count, matching how the shop would quote it.
Notes are quoted from delivered takeoffs with client and project names removed. Every package ships with notes like these, so you can see what was assumed, what was left out and why, before you bid. See how we estimate.
A real millwork estimate
Millwork cost breakdown for a four-story hotel
Line totals from one finished estimate: a four-story, 59,366 square foot hotel in South Carolina with 89 guestrooms in six room groups, plus the lobby, breakfast, fitness and back-of-house millwork.
Millwork came to $620,520, about $10.45 per square foot of building, and $682,570 with general requirements. Guestroom casework was about 80% of it: base cabinetry, closet systems, drybars, kitchenettes and vanities repeated across the room types. With 25% overhead and profit, 3% insurance, 5% contingency and 7% tax, the suggested bid was $955,598, or $16.10 per square foot.
Figures are from the delivered estimate, labor plus material, rounded to the dollar, with related lines combined. They are specific to that project and are not a price guide.
Real jobs, not a price list. Each figure comes from one project, priced for its own ZIP code and that client's wages, overhead and profit. Prices change by region and over time. Yours will be priced for your location.
| Item | Quantity | Cost |
|---|---|---|
| Guestroom base cabinetry, 5'-6" (ML-016) | 84 EA | $232,039 |
| Closet shelving systems | 89 EA | $98,556 |
| Guest drybars, standard and accessible | 80 EA | $92,101 |
| Extended-stay kitchenettes and storage units | 26 EA | $60,201 |
| Other common-area casework, 9 tags | 16 EA | $37,248 |
| Wood trim at doors and walls | 5,263 LF | $24,001 |
| Buffet cabinetry (ML-006) | 4 EA | $22,242 |
| Wood slat feature wall (ML-013) | 55 EA | $18,854 |
| Front desk, 3'-2" x 16'-0" (ML-001) | 1 EA | $17,074 |
| Accessible vanities (ML-017) | 5 EA | $12,213 |
| Oak handrails, stained | 261 LF | $5,991 |
| Millwork trade cost | $620,520 |
Building somewhere else? See figures from jobs in Texas, California, Florida and other service areas.
Samples
Ask for a sample in your trade
We do not have a Millwork & Casework sample online yet, but we can send one from a finished project.
This is one real job, shown as an example. It was built to that client's own specification: their wage rates, labor style, type of pricing, and overhead and profit. Prices also change by region and over time, so yours will be priced for your location.
Want a current sample in your own trade or specialty, or have a question? Use the contact form, email info@massbidestimation.com or call (832) 356-4237.
Who it is for
Millwork estimating for millwork shops and general contractors
Millwork shops and fabricators
Every tag counted and sized, so you can price fabrication from your own shop rates.
Carpentry estimatingCasework installers
Assemblies by room type and floor, with the install labor per line.
Commercial estimatingHotel and multifamily contractors
Unit casework multiplied by room type, with owner-procured items noted and left out.
Residential estimatingGeneral contractors
An independent millwork number to level subcontractor quotes.
GC estimating
Millwork scopes we take off
- Base and wall cabinets
- Reception and front desks
- Vanities and lavatory tops
- Quartz and solid-surface countertops
- Plastic laminate casework
- Wood veneer paneling
- Slat and feature walls
- Closet shelving systems
- Kitchenettes and pantries
- Wood trim, base and casing
- Wood handrails
- Built-in benches and shelving
Pricing data
Where the prices come from
Quantities are priced from our own pricing database, built with local vendors across the United States. The estimator enters the project's ZIP code and gets current material prices for that market.
Material prices change from region to region and from month to month, so a price book or a national average is out of date before the bid goes in.
Priced by ZIP code
Current local material prices for the place the job is built, not a national average.
Updated by vendors
Local vendors update their prices in the database as they change.
Labor as you bid it
Union, open shop, or Davis-Bacon and prevailing wage rates with fringes.
How one line item is priced
- 01Quantitymeasured from your drawings
- 02× Material pricelocal vendor price for the ZIP code
- 03+ Laborhours × the rate you bid with
- 04= Line totalrolled up by CSI division
How it works
From drawings to a finished millwork estimate
Send the drawings
Plans, enlarged plans, interior elevations, millwork details and sections, the finish schedule, the specification or product manual, and addenda.
Free quote
We review the set and reply with a quote and a delivery date, usually within about 20 minutes.
Count, describe, price and two QA reviews
Each assembly is tagged and counted on the sheets, sized from the elevations and described from the details. A separate QA team checks the counts against the room types, then the priced estimate.
Delivery and revisions
The package typically arrives within 24 to 48 hours. Addenda and design changes are revised free, with no limit and no time limit.
The work is done in-house by more than 20 estimators, typically with 7 to 10 years of industry experience.
What it costs
Millwork estimating prices
- Single project
- From $199. Simple scopes typically run $100 to $250.
- Larger buildings
- Typically $200 to $500. Large or multi-building projects are quoted individually.
- Monthly plan
- From $1,499 for 10 to 15 projects, for millwork shops that bid every week.
Contractors who do not keep a full-time estimator use this as outsourced millwork & casework: send the drawings when a bid comes up and pay per project.
Every job is quoted individually from the drawings, and the quote is free. See all pricing
After delivery
An editable Excel estimate workbook and unlimited free revisions
- Formulas built in
An Excel workbook you can change yourself
The estimate arrives as an editable Excel workbook with the formulas built in. Change a quantity, a rate or a markup and every total follows. Move overhead and profit from 25% to 30% and the whole bid recalculates on the spot.
- No waiting
Adjust your bid at the last minute
If something changes just before the deadline, you do not have to send the estimate back and wait. Open the workbook, change the number and submit. The control stays with you.
- Priority turnaround
Unlimited free revisions
Addenda, scope changes and pricing updates are all free, however many times you come back, and there is no time limit. Revisions are handled on priority and typically come back within an hour to a few hours.
Questions
Millwork estimating FAQ
It is the takeoff and pricing of a building's architectural woodwork: casework, desks, vanities, countertops, paneling, trim and handrails. Each assembly is counted by its millwork tag, sized from the elevations and described from the details, then priced with fabrication and installation.
Casework is the boxes: cabinets, vanities and storage units. Millwork is the wider term for all custom architectural woodwork, including casework, paneling, trim, desks and other built pieces made in a shop.
Casework and assemblies are counted each, by tag, with their width, depth and height. Countertops are measured in linear or square feet, paneling in square feet, slat walls by count and length, and trim and handrails in linear feet.
Each tag is counted on every room-type plan and multiplied by the rooms of that type. On a four-story hotel we estimated, 89 guestrooms in six room groups produced 84 base cabinets, 89 closet systems and 80 drybars; guestroom casework was about 80% of the millwork cost.
No, unless you ask us to. Items the owner or brand buys directly are left out and listed in the estimate notes, quoting the drawing note that makes them owner-furnished, so nothing is priced twice.
It depends heavily on the building type. On one four-story hotel we estimated, millwork was about $10.45 per square foot of building before markups, with guestroom casework the largest share.
From our own pricing database, built with local vendors across the United States. An estimator enters the project's ZIP code and gets current material prices for that market, and vendors update their prices as they change. Labor is priced as union or open shop, or at Davis-Bacon rates with fringes on government work.
Yes. The estimate is delivered as an editable Excel workbook with the formulas built in. Change any quantity, rate or markup and the whole estimate recalculates. If overhead and profit was set at 25% and you want 30%, change that one cell and every total updates, so you can adjust your number minutes before the bid is due without sending it back to us.
As many as you need. Every revision is free, including addenda, scope changes and pricing updates, however many times you come back, and there is no time limit. Revisions are handled on priority and are typically returned within an hour to a few hours, depending on the size of the change.
Division 06: architectural wood casework is 06 41 00, wood paneling 06 42 00 and wood trim 06 46 00. Countertops are usually 12 36 00.
A single project starts at $199 and larger buildings typically run $200 to $500; the quote is free and usually back in about 20 minutes. Every estimate is built to the client's own specification, with your shop rates and format if you send them.
Related services and service areas
Have a millwork bid due? Send the drawings.
Free quote in about 20 minutes. Millwork and casework takeoffs and estimates typically in 24 to 48 hours, built to your format, with free revisions with no limit. Based in Houston and estimating millwork in all 50 states.
