Sample construction estimates by CSI division

37 finished estimates and takeoffs you can open full screen and zoom into, from general requirements to site utilities.

PlanSwift
Bluebeam Revu
On-Screen Takeoff
Primavera P6
Autodesk Revit
CSI MasterFormat
Xactimate
PlanSwift
Bluebeam Revu
On-Screen Takeoff
Primavera P6
Autodesk Revit
CSI MasterFormat
Xactimate

In short

These are pages from real estimates and quantity takeoffs prepared by MassBid Estimation, covering 21 CSI MasterFormat divisions, three whole-project estimates and supplier, hardware and lumber takeoffs. Each shows the line-by-line breakdown a contractor receives: quantity, waste, labor hours, wage, material and unit cost.

Click any sample to open it full screen. Scroll through the pages, use the plus and minus buttons to zoom, and close it with the button, the Escape key or a click outside the page. Client names, addresses and project details have been removed, and every page carries our watermark.

Sample estimates and takeoffs

  • General contractor estimate sample

    Restaurant fit-out, 1,375 sq ft, Texas

    Division summary and the line-by-line breakdown for every trade on a tenant fit-out: demolition, framing, finishes, kitchen equipment, plumbing, HVAC and electrical, with labor hours, wage, material and unit cost on each line.

    Pages
    8 of 18
    Estimate
    $258,775 trade cost
    GC estimating →
  • General requirements sample

    Childcare center, 10,100 sq ft, Texas

    Supervision, mobilization, temporary facilities, permits, cleaning and closeout carried as their own lines, so they are visible and not buried in unit rates.

    Pages
    1
    Estimate
    $221,400
    GC estimating →
  • Demolition sample

    Education building, 8,260 sq ft, Maryland

    Selective demolition by item: partitions, doors, ceilings, flooring, fixtures and equipment to remove, with haul-off and disposal.

    Pages
    3
    Estimate
    $57,620 suggested bid
    Demolition estimating →
  • Concrete and rebar sample

    Multi-story building, California

    Footings, mat foundation, walls, columns and elevated slabs, each broken into concrete, formwork and reinforcing by bar size, with a division summary.

    Pages
    8 of 14
    Estimate
    $846,899 concrete
    Concrete estimating →
  • Masonry sample

    Outdoor structure, Ohio

    Concrete block by size, with grout, vertical bars and ladder reinforcement calculated on separate lines.

    Pages
    1
    Masonry estimating →
  • Structural and miscellaneous steel sample

    Retail store addition, 5,155 sq ft, Florida

    Beams, lintels, angles, embed plates, roof deck, a ladder and connection hardware listed member by member with weight.

    Pages
    3
    Estimate
    $160,679 metals
    Steel estimating →
  • Rough carpentry sample

    Apartment building, Pennsylvania

    Wall studs and plates by size and length, floor and roof framing, sheathing, blocking and hardware, with labor hours on every line.

    Pages
    8 of 10
    Carpentry estimating →
  • Roofing and sheet metal sample

    Drive-through building, Oklahoma

    Membrane roofing, insulation, metal panels, coping, flashings at drains, curbs and scuppers, each measured and priced.

    Pages
    3
    Estimate
    $35,026 suggested bid
    Roofing estimating →
  • Storefront and glazing sample

    Equipment rental building, 10,500 sq ft, North Carolina

    Aluminum storefront frames and doors by mark, with glass type, lite sizes and hardware on each line.

    Pages
    4
    Estimate
    $89,144
    Storefront estimating →
  • Drywall and metal framing sample

    Childcare center, 10,100 sq ft, Texas

    Partitions by wall type: metal studs, runners, slip joints, gypsum board by layer, insulation, finishing and sealants.

    Pages
    6
    Drywall estimating →
  • Flooring sample

    City recreation center, 11,500 sq ft, Texas

    Seven floor finishes by tag, with wall base and transitions, waste factors, labor hours and material cost.

    Pages
    3
    Estimate
    $86,873 flooring
    Flooring estimating →
  • Painting sample

    Retail store, Massachusetts

    Walls, ceilings, doors and frames by paint system and surface, separating new and existing substrates.

    Pages
    5
    Estimate
    $76,953 suggested bid
    Painting estimating →
  • Specialties sample

    Restaurant fit-out, 1,375 sq ft, Texas

    Toilet accessories, signage and fire extinguishers counted from the plans and schedules.

    Pages
    1
    GC estimating →
  • Equipment sample

    Childcare center, 10,100 sq ft, Texas

    Kitchen and pantry equipment from the equipment schedule, noting what the contractor supplies and installs.

    Pages
    1
    GC estimating →
  • Furnishings and casework sample

    Childcare center, 10,100 sq ft, Texas

    Casework, countertops, cubbies and window treatments by length and count.

    Pages
    5
    Carpentry estimating →
  • Fire suppression sample

    Childcare center, 10,100 sq ft, Texas

    Sprinkler heads by type, pipe by diameter, fittings, valves and the riser assembly.

    Pages
    1
    Estimate
    $134,007
    MEP estimating →
  • Plumbing sample

    Three-story apartment building, 30,900 sq ft, Florida

    Waste, vent and water pipe by diameter, fittings counted, fixtures, water heaters and insulation, floor by floor.

    Pages
    6
    Estimate
    $882,592 plumbing
    Plumbing estimating →
  • HVAC sample

    Four-story hotel, 80,500 sq ft, Florida

    Equipment from the schedules, ductwork by size, air devices, refrigerant piping, insulation and controls.

    Pages
    6
    Estimate
    $764,512 HVAC
    HVAC estimating →
  • Electrical sample

    Apartment building, 12,200 sq ft, California

    Panels and breakers, fixtures by type, receptacles and switches, wire and conduit by size, with unit labor hours.

    Pages
    4
    Estimate
    $238,337 electrical
    Electrical estimating →
  • Communications and low voltage sample

    Restaurant fit-out, 1,375 sq ft, Texas

    Data outlets, cabling, speakers and rough-in for the owner's low-voltage contractor.

    Pages
    1
    Low voltage estimating →
  • Fire alarm and security sample

    Restaurant fit-out, 1,375 sq ft, Texas

    Smoke detectors, sensors, back boxes, conduit and wire counted from the electrical plans.

    Pages
    1
    Fire alarm estimating →
  • Earthwork sample

    Childcare center site, Texas

    Clearing, cut and fill, trenching for utilities, erosion control and site fencing.

    Pages
    2
    Estimate
    $140,732
    Earthwork estimating →
  • Asphalt paving and site concrete sample

    City road and roundabout, Florida

    Full reconstruction, milling and resurfacing and a shared-use path as separate pavement sections, with curb, sidewalk, striping and signs.

    Pages
    6
    Estimate
    $538,980 paving
    Asphalt paving estimating →
  • Site utilities sample

    Convenience store and fuel site, Michigan

    Storm, sanitary and water pipe by size and depth, structures, fittings, trenching, bedding and an underground detention system.

    Pages
    8 of 10
    Estimate
    $1,007,270 suggested bid
    Site utilities estimating →
  • Supplier takeoff: flashing and windows sample

    Three-story apartment community, Texas

    A material takeoff for a building-materials supplier: every metal flashing profile in pieces of stock length and every window by size and cladding, with the drawing reference for each line.

    Pages
    1
    Flashing takeoffs →
  • Supplier takeoff: sill sealer, adhesive and flashing sample

    Mid-rise apartment building, Texas

    Sill sealer in rolls, subfloor panel adhesive in tubes floor by floor, the hardware package and each flashing profile, all in the units a supplier orders in.

    Pages
    3
    Wrap and sill sealer takeoffs →
  • Supplier takeoff: structural hardware sample

    Nursing home, Texas

    Connectors, hangers, straps, holdowns, anchors and fasteners counted by model from the structural drawings, with the sheet reference on each line.

    Pages
    1
    Structural hardware takeoffs →
  • Lumber takeoff sample

    Multi-story residential building, 31,200 sq ft, Colorado

    Framing lumber by member: studs, plates, headers, joists, beams, sheathing and blocking by size and length, floor by floor. Quantities only, for a lumber yard to price.

    Pages
    8 of 29
    Lumber takeoff →
  • Precast concrete sample

    School storm shelter building, 9,200 sq ft, Oklahoma

    Precast wall panels and roof members by mark and size, with embeds, connections, grout and erection.

    Pages
    3
    Estimate
    $291,920 suggested bid
    Precast estimating →
  • Waterproofing and coatings sample

    Wastewater treatment plant, California

    Water repellent, dampproofing and concrete and steel coatings by structure and system, with surface preparation.

    Pages
    7
    Estimate
    $1,362,902
    Waterproofing estimating →
  • Firestopping sample

    Retail tenant space, New York

    Firestop at pipe, duct and conduit penetrations by size and rating, and joint sealant by length. Quantities only.

    Pages
    1
    Firestopping estimating →
  • Roof repair sample

    Three-story dormitory, 15,560 sq ft, Texas

    A repair scope on an existing metal roof: gutter, roof curb, flashing, sealant and abandoned penetrations, with material and labor on each line.

    Pages
    2
    Estimate
    $47,826
    Roofing estimating →
  • Storefront, doors and windows sample

    Automotive service building, 5,600 sq ft, Kentucky

    Storefront frames, entrance doors and windows by type, each with its glass type and lite sizes.

    Pages
    5
    Estimate
    $32,927
    Storefront estimating →
  • Plumbing and HVAC sample

    Fire station, 9,250 sq ft, Florida

    Plumbing pipe, fittings and fixtures with HVAC equipment, ductwork and air devices in one estimate for a mechanical contractor.

    Pages
    4
    MEP estimating →
  • Sidewalk and site concrete sample

    Public sidewalk project, Florida

    Concrete sidewalk, accessible ramps, curb and gutter, driveway repairs and restoration along the route.

    Pages
    3
    Estimate
    $100,517 suggested bid
    Exterior improvements →
  • Residential estimate sample

    House addition and renovation, New York

    Every trade on a small residential job: demolition, framing, roofing, finishes, plumbing and electrical, with a division summary.

    Pages
    4
    Estimate
    $70,858 suggested bid
    Residential estimating →
  • Office alteration estimate sample

    First-floor office, 1,580 sq ft, Washington DC

    Demolition and architectural work for an interior alteration: partitions, doors, millwork, ceilings, flooring and paint, with general requirements itemized.

    Pages
    6
    Estimate
    $126,270 trade cost
    Remodeling estimating →

All samples by CSI division

The full list in division order. Each row names the trade, the building it was estimated for and what the pages show.

Sample construction estimates by CSI MasterFormat division, with the building type, state and contents of each sample PDF.
DivisionSampleBuildingWhat the pages show
AllGeneral contractor estimateRestaurant fit-out, 1,375 sq ft, TexasDivision summary and the line-by-line breakdown for every trade on a tenant fit-out: demolition, framing, finishes, kitchen equipment, plumbing, HVAC and electrical, with labor hours, wage, material and unit cost on each line.
01General requirementsChildcare center, 10,100 sq ft, TexasSupervision, mobilization, temporary facilities, permits, cleaning and closeout carried as their own lines, so they are visible and not buried in unit rates.
02DemolitionEducation building, 8,260 sq ft, MarylandSelective demolition by item: partitions, doors, ceilings, flooring, fixtures and equipment to remove, with haul-off and disposal.
03Concrete and rebarMulti-story building, CaliforniaFootings, mat foundation, walls, columns and elevated slabs, each broken into concrete, formwork and reinforcing by bar size, with a division summary.
04MasonryOutdoor structure, OhioConcrete block by size, with grout, vertical bars and ladder reinforcement calculated on separate lines.
05Structural and miscellaneous steelRetail store addition, 5,155 sq ft, FloridaBeams, lintels, angles, embed plates, roof deck, a ladder and connection hardware listed member by member with weight.
06Rough carpentryApartment building, PennsylvaniaWall studs and plates by size and length, floor and roof framing, sheathing, blocking and hardware, with labor hours on every line.
07Roofing and sheet metalDrive-through building, OklahomaMembrane roofing, insulation, metal panels, coping, flashings at drains, curbs and scuppers, each measured and priced.
08Storefront and glazingEquipment rental building, 10,500 sq ft, North CarolinaAluminum storefront frames and doors by mark, with glass type, lite sizes and hardware on each line.
09Drywall and metal framingChildcare center, 10,100 sq ft, TexasPartitions by wall type: metal studs, runners, slip joints, gypsum board by layer, insulation, finishing and sealants.
09FlooringCity recreation center, 11,500 sq ft, TexasSeven floor finishes by tag, with wall base and transitions, waste factors, labor hours and material cost.
09PaintingRetail store, MassachusettsWalls, ceilings, doors and frames by paint system and surface, separating new and existing substrates.
10SpecialtiesRestaurant fit-out, 1,375 sq ft, TexasToilet accessories, signage and fire extinguishers counted from the plans and schedules.
11EquipmentChildcare center, 10,100 sq ft, TexasKitchen and pantry equipment from the equipment schedule, noting what the contractor supplies and installs.
12Furnishings and caseworkChildcare center, 10,100 sq ft, TexasCasework, countertops, cubbies and window treatments by length and count.
21Fire suppressionChildcare center, 10,100 sq ft, TexasSprinkler heads by type, pipe by diameter, fittings, valves and the riser assembly.
22PlumbingThree-story apartment building, 30,900 sq ft, FloridaWaste, vent and water pipe by diameter, fittings counted, fixtures, water heaters and insulation, floor by floor.
23HVACFour-story hotel, 80,500 sq ft, FloridaEquipment from the schedules, ductwork by size, air devices, refrigerant piping, insulation and controls.
26ElectricalApartment building, 12,200 sq ft, CaliforniaPanels and breakers, fixtures by type, receptacles and switches, wire and conduit by size, with unit labor hours.
27Communications and low voltageRestaurant fit-out, 1,375 sq ft, TexasData outlets, cabling, speakers and rough-in for the owner's low-voltage contractor.
28Fire alarm and securityRestaurant fit-out, 1,375 sq ft, TexasSmoke detectors, sensors, back boxes, conduit and wire counted from the electrical plans.
31EarthworkChildcare center site, TexasClearing, cut and fill, trenching for utilities, erosion control and site fencing.
32Asphalt paving and site concreteCity road and roundabout, FloridaFull reconstruction, milling and resurfacing and a shared-use path as separate pavement sections, with curb, sidewalk, striping and signs.
33Site utilitiesConvenience store and fuel site, MichiganStorm, sanitary and water pipe by size and depth, structures, fittings, trenching, bedding and an underground detention system.
07Supplier takeoff: flashing and windowsThree-story apartment community, TexasA material takeoff for a building-materials supplier: every metal flashing profile in pieces of stock length and every window by size and cladding, with the drawing reference for each line.
06Supplier takeoff: sill sealer, adhesive and flashingMid-rise apartment building, TexasSill sealer in rolls, subfloor panel adhesive in tubes floor by floor, the hardware package and each flashing profile, all in the units a supplier orders in.
06Supplier takeoff: structural hardwareNursing home, TexasConnectors, hangers, straps, holdowns, anchors and fasteners counted by model from the structural drawings, with the sheet reference on each line.
06Lumber takeoffMulti-story residential building, 31,200 sq ft, ColoradoFraming lumber by member: studs, plates, headers, joists, beams, sheathing and blocking by size and length, floor by floor. Quantities only, for a lumber yard to price.
03Precast concreteSchool storm shelter building, 9,200 sq ft, OklahomaPrecast wall panels and roof members by mark and size, with embeds, connections, grout and erection.
07Waterproofing and coatingsWastewater treatment plant, CaliforniaWater repellent, dampproofing and concrete and steel coatings by structure and system, with surface preparation.
07FirestoppingRetail tenant space, New YorkFirestop at pipe, duct and conduit penetrations by size and rating, and joint sealant by length. Quantities only.
07Roof repairThree-story dormitory, 15,560 sq ft, TexasA repair scope on an existing metal roof: gutter, roof curb, flashing, sealant and abandoned penetrations, with material and labor on each line.
08Storefront, doors and windowsAutomotive service building, 5,600 sq ft, KentuckyStorefront frames, entrance doors and windows by type, each with its glass type and lite sizes.
22Plumbing and HVACFire station, 9,250 sq ft, FloridaPlumbing pipe, fittings and fixtures with HVAC equipment, ductwork and air devices in one estimate for a mechanical contractor.
32Sidewalk and site concretePublic sidewalk project, FloridaConcrete sidewalk, accessible ramps, curb and gutter, driveway repairs and restoration along the route.
AllResidential estimateHouse addition and renovation, New YorkEvery trade on a small residential job: demolition, framing, roofing, finishes, plumbing and electrical, with a division summary.
AllOffice alteration estimateFirst-floor office, 1,580 sq ft, Washington DCDemolition and architectural work for an interior alteration: partitions, doors, millwork, ceilings, flooring and paint, with general requirements itemized.

After delivery

An editable Excel workbook and free revisions

  • Formulas built in

    An Excel workbook you can change yourself

    The estimate arrives as an editable Excel workbook with the formulas built in. Change a quantity, a rate or a markup and every total follows. Move overhead and profit from 25% to 30% and the whole bid recalculates on the spot.

  • No waiting

    Adjust your bid at the last minute

    If something changes just before the deadline, you do not have to send the estimate back and wait. Open the workbook, change the number and submit. The control stays with you.

  • Priority turnaround

    Free revisions, with no limit

    Addenda, scope changes and pricing updates are all free, however many times you come back, and there is no time limit. Revisions are handled on priority and typically come back within an hour to a few hours.

Questions about the samples

Click any sample to open it full screen, scroll through its pages and zoom in or out. The samples are for viewing on this page and are not offered as downloads. Every page carries the MassBid Estimation watermark, and client and project details have been removed. If you would like a copy for your own trade, ask us.

Because each estimate was built to that client's own specification. Every contractor has their own wage rates, labor productivity, type of pricing, and overhead and profit, so the rates, markups and layout in one sample will not match another, or your own.

No. They are finished estimates from past projects, priced for that project's location at that time. Material and labor prices change by region and over time. For current pricing on your own project, send the drawings for a free quote.

Yes. If your trade or building type is not shown, or you want a more recent example, ask and we will send one. Use the contact form, email [email protected] or call (832) 356-4237.

Most samples have a division summary and the line-by-line breakdown: each item with its drawing reference, unit, quantity, waste, labor hours, hourly wage, labor cost, material cost and unit cost. Longer estimates show the first eight pages.

Divisions 01 through 12, 21, 22, 23, 26, 27, 28, 31, 32 and 33, plus three whole-project estimates and supplier, structural hardware and lumber takeoffs. That covers general requirements, demolition, concrete, masonry, steel, carpentry, roofing, glazing, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, low voltage, earthwork, paving and site utilities.

Only if you want it to. We work in your template, your bid form or the format your general contractor asks for, with the level of detail your bid needs.

Yes. The estimate is delivered as an editable Excel workbook with the formulas built in. Change any quantity, rate or markup and the whole estimate recalculates. If overhead and profit was set at 25% and you want 30%, change that one cell and every total updates, so you can adjust your number minutes before the bid is due without sending it back to us.

As many as you need. Every revision is free, including addenda, scope changes and pricing updates, however many times you come back, and there is no time limit. Revisions are handled on priority and are typically returned within an hour to a few hours, depending on the size of the change.

Want a sample in your own trade?

Tell us your trade or specialty and we will send a recent example. Or send your drawings for a free quote, usually back in about 20 minutes.