BIM estimating services: 3D, 4D and 5D

Quantities taken from your Revit or Navisworks model, checked against the drawings for what the model leaves out, and priced by CSI division.

  • Model quantities, checked
  • Unmodeled scope added
  • Two QA reviews on every job
PlanSwift
Bluebeam Revu
On-Screen Takeoff
Primavera P6
Autodesk Revit
CSI MasterFormat
Xactimate
PlanSwift
Bluebeam Revu
On-Screen Takeoff
Primavera P6
Autodesk Revit
CSI MasterFormat
Xactimate

In short

What BIM estimating covers

BIM estimating is cost estimating that takes its quantities from a building information model instead of measuring them from flat drawings. Elements are counted and measured in the model, checked against the drawings for anything the model leaves out, and priced. Linking those quantities to cost is known as 5D BIM. MassBid Estimation prepares model-based quantity takeoffs and estimates from Revit and Navisworks models for contractors, design-build teams and owners.

Models
Autodesk Revit and Navisworks; other formats on request
You send
The model, the drawing set and specifications, and the level of development it was built to
You get
A quantity takeoff, a priced workbook by CSI division, and a list of what the model did not contain
Dimensions
3D quantities, 4D links to the schedule, 5D links to cost
Checked by
A separate QA team, twice on every job
Turnaround
24 to 48 hours on most projects; large models are scheduled with the quote
Coverage
All 50 states, priced to the project's ZIP code
Quote
Free, usually back in about 20 minutes

Coordination meeting · Tuesday

The model is beautiful. The quantity report it produced is missing the rebar, the fasteners, and half the scope that will actually be bought.

A building information model can count its own doors in seconds, and that speed makes its quantities easy to trust. But a model only knows what somebody modeled. Reinforcing, sealants, hangers, blocking, temporary work and most of the site are usually absent, and nothing in the report says so.

The opposite problem is as common. Walls drawn through each other, elements duplicated across linked files and components with their parameters left blank all produce numbers that look exact and are wrong. A model-based estimate is only as good as the checking behind it.

Four ways a model-based estimate goes wrong

  • 01 · The unmodeled scope

    What nobody drew in three dimensions

    Reinforcing steel, connections, sealants, fire-stopping, hangers and general requirements are rarely modeled. A quantity report cannot list what is not there.

    What changes

    Unmodeled scope is taken off from the drawings and specifications and added to the estimate.

  • 02 · The duplicate

    The same element counted twice

    A slab modeled in both the architectural and structural files, or a wall overlapping another, doubles a quantity without any warning.

    What changes

    Model quantities are checked against the drawings and against each other before they are priced.

  • 03 · The level of development

    A model that is less finished than it looks

    A generic wall with no layers defined still reports an area. Pricing it as a finished assembly assumes detail the designer has not yet decided.

    What changes

    The model's level of development is recorded by element, and anything generic is priced as an allowance and said to be one.

  • 04 · The model and the drawings

    Two sources that disagree

    The contract is usually the drawings, not the model. When they differ, an estimate built only from the model is priced on the wrong one.

    What changes

    Differences between the model and the drawings are listed as clarifications, with the sheets named.

Then and now

What has changed in BIM estimating

For years the model was the designer's tool and the estimate was still measured from printed sheets. Four things have brought the two together.

  1. The model has become a deliverable

    More owners and public agencies now ask for a building information model as part of the project record, so a model exists on jobs where it once would not have.

  2. More trades model their own work

    Structural steel, ductwork and piping are often detailed in three dimensions for fabrication. Those quantities are available earlier and in more detail than drawings alone would give.

  3. Models are shared, not handed over

    Coordination now happens in shared, cloud-hosted models that change week to week. An estimate has to be tied to a dated version of the model, and updated when it moves.

  4. Cost is being linked to the model

    Linking quantities to cost, known as 5D, lets a design change show its cost effect quickly. It only works if someone has checked that the model's quantities are complete.

What you receive

Model-based takeoff and estimate samples

The earthwork model below was built by our estimators from a grading plan. The two workbook pages are from a drawing-based estimate of the same commercial building in Texas and show the format a model-based estimate is delivered in. Client names, addresses and title blocks are removed. Click any page to enlarge.

Surface model

Earthwork cut and fill model built from the grading plan

Protects you fromAn earthwork quantity built on a rule of thumb.

Cost summary

Cost summary by CSI division with cost per square foot

Protects you fromA model quantity report with no prices attached.

Line-item detail

Priced line items with labor and material for each element

Protects you fromConcrete priced without the steel and forms that go with it.

Every estimate is built to the client's own specification, so yours may be laid out differently. To see a past project in your own trade, ask for an example. Examples are finished work for other projects, not an estimate of yours; for pricing on your own job, send the model and drawings for a free quote.

What a model can tell you

What can be estimated at each level of development

How much of an estimate can come from a model depends on its level of development, or LOD: the degree to which each element's geometry and information have been defined.

At low LOD the model gives areas and counts suited to a budget. At LOD 300 and above, most building elements can be quantified directly. At no level does a model normally contain everything that has to be bought, which is why the drawings and specifications are read alongside it.

Level of development definitions follow the framework published by BIMForum. What a particular model contains depends on the project's BIM execution plan.

Real jobs, not a price list. Each figure comes from one project, priced for its own ZIP code and that client's wages, overhead and profit. Prices change by region and over time. Yours will be priced for your location.

Levels of development of a building information model, showing what the model contains at each level and what can be estimated from it.
LODWhat the model containsWhat can be estimated
LOD 100Symbols or masses; no real geometryCost per square foot or per unit; a concept budget
LOD 200Generic elements with approximate size and locationSystem-level quantities; a schematic estimate
LOD 300Specific elements with accurate size, shape and locationMeasured quantities for most building elements
LOD 350As LOD 300, plus connections and interfaces with other elementsQuantities including supports and connections that are modeled
LOD 400Fabrication and installation detailShop-level quantities for the trades that modeled to this level

Building somewhere else? See figures from jobs in Texas, California, Florida and other service areas.

Samples

Ask for a sample in your trade

We do not have a BIM Estimating sample online yet, but we can send one from a finished project.

This is one real job, shown as an example. It was built to that client's own specification: their wage rates, labor style, type of pricing, and overhead and profit. Prices also change by region and over time, so yours will be priced for your location.

Want a current sample in your own trade or specialty, or have a question? Use the contact form, email [email protected] or call (832) 356-4237.

See all samples by CSI division →

Pricing data

Where the prices come from

Quantities are priced from our own pricing database, built with local vendors across the United States. The estimator enters the project's ZIP code and gets current material prices for that market.

Material prices change from region to region and from month to month, so a price book or a national average is out of date before the bid goes in.

  • Priced by ZIP code

    Current local material prices for the place the job is built, not a national average.

  • Updated by vendors

    Local vendors update their prices in the database as they change.

  • Labor as you bid it

    Union, open shop, or Davis-Bacon and prevailing wage rates with fringes.

How it works

From model to a checked estimate

  1. Send the model and the drawings

    The model file, the drawing set and specifications, the level of development it was built to, and your own template or cost codes.

  2. Free quote

    We review the model and reply with a quote and a delivery date, usually within about 20 minutes.

  3. Extract, check, add and price

    Quantities are extracted from the model, checked against the drawings, and completed with a takeoff of what is not modeled. A separate QA team reviews the quantities and then the priced estimate.

  4. Delivery and model revisions

    The estimate is delivered with a list of model gaps and assumptions. When the model is revised, quantities and costs are updated against the new version.

The work is done in-house by more than 20 estimators, typically with 7 to 10 years of industry experience.

What it costs

BIM estimating prices

Single trade
From $199. Simple scopes typically run $100 to $250.
Multi-trade model
Typically $200 to $500. Large or complex models are quoted individually.
Monthly plan
From $1,499 for 10 to 15 projects, for teams estimating from models every week.

Every job is quoted individually from the drawings, and the quote is free. See all pricing

After delivery

An editable Excel workbook and free revisions

  • Formulas built in

    An Excel workbook you can change yourself

    The estimate arrives as an editable Excel workbook with the formulas built in. Change a quantity, a rate or a markup and every total follows. Move overhead and profit from 25% to 30% and the whole bid recalculates on the spot.

  • No waiting

    Adjust your bid at the last minute

    If something changes just before the deadline, you do not have to send the estimate back and wait. Open the workbook, change the number and submit. The control stays with you.

  • Priority turnaround

    Free revisions, with no limit

    Addenda, scope changes and pricing updates are all free, however many times you come back, and there is no time limit. Revisions are handled on priority and typically come back within an hour to a few hours.

Questions

BIM estimating FAQ

It is cost estimating that takes its quantities from a building information model instead of measuring them from two-dimensional drawings. Elements in the model are counted and measured, checked against the drawings, completed with a takeoff of anything that was not modeled, and priced.

3D is the model's geometry, from which quantities are taken. 4D links model elements to the construction schedule, so the sequence of the work can be seen over time. 5D links them to cost, so quantities and prices update when the design changes.

It depends on the estimate. A model at LOD 100 or 200 supports a concept or schematic budget. Measured quantities for most building elements need LOD 300 or higher. Elements below that level are priced as allowances and identified as such.

Autodesk Revit and Navisworks models are the usual sources. If your model is in another format, send it with the quote request and we will confirm whether we can work from it or from an export.

For the elements that are modeled correctly, it is faster and removes measuring error. It is not automatically more complete. Reinforcing, connections, sealants, hangers, temporary work and general requirements are usually not in the model and still have to be taken off from the drawings and specifications.

The difference is listed as a clarification, with the sheets and model elements named, so you can raise it with the design team. The estimate states which source was priced.

Yes, and this is the usual case. Quantities come from the model where one exists and from the drawings elsewhere, in a single estimate organized by CSI division.

From our own pricing database, built with local vendors across the United States. An estimator enters the project's ZIP code and gets current material prices for that market, and vendors update their prices as they change. Labor is priced as union or open shop, or at Davis-Bacon rates with fringes on government work.

Yes. The estimate is delivered as an editable Excel workbook with the formulas built in. Change any quantity, rate or markup and the whole estimate recalculates. If overhead and profit was set at 25% and you want 30%, change that one cell and every total updates, so you can adjust your number minutes before the bid is due without sending it back to us.

As many as you need. Every revision is free, including addenda, scope changes and pricing updates, however many times you come back, and there is no time limit. Revisions are handled on priority and are typically returned within an hour to a few hours, depending on the size of the change.

A single trade starts at $199. A multi-trade model typically runs $200 to $500, and large or complex models are quoted individually. The quote is free and usually comes back in about 20 minutes.

Because checking a model's quantities takes time and people who can read both the model and the drawings. Outsourcing gives a contractor or design team a checked, priced takeoff without building that capacity in-house.