For plumbing contractors
Plumbing estimating and takeoff services
Pipe measured by system and diameter, every fitting and fixture counted, above grade and below, and priced line by line.
- Fittings counted, not factored
- Above and below grade
- 24 to 48 hours
In short
What plumbing estimating covers
Plumbing estimating is the takeoff and pricing of a building's plumbing systems: domestic water, sanitary waste and vent, storm drainage, condensate and gas piping, with the fittings, valves, insulation, fixtures and equipment they connect. Pipe is measured by system, material and diameter, and fittings and fixtures are counted. MassBid Estimation prepares plumbing takeoffs and estimates for plumbing contractors, general contractors and suppliers, typically in 24 to 48 hours.
- Systems
- Domestic hot and cold water, sanitary waste and vent, storm, condensate, natural gas
- CSI division
- 22 Plumbing, with 21 Fire Suppression where it is on the drawings
- You send
- Plumbing plans, riser diagrams, fixture and equipment schedules, specs and addenda
- You get
- Marked-up plans, a priced workbook with labor hours per line, and a material list
- Turnaround
- 24 to 48 hours on most projects
- Checked by
- A separate QA team, twice on every job
- Coverage
- All 50 states, priced to the project's ZIP code
- Quote
- Free, usually back in about 20 minutes
Bid day · 11:30 AM
Fourteen sheets of plumbing, four floors, and a fitting count that is still a percentage of the pipe.
On a plumbing job the pipe is the easy part. It is drawn as lines and can be measured. The labor is in the fittings: every elbow, tee, wye and reducer is a joint to be made, and they are not drawn to be counted.
So most bids measure the pipe and add a percentage for fittings. Where the runs are long and straight the percentage is generous. In a hotel or an apartment building, where every unit has a bathroom and every bathroom has thirty joints, it falls well short, and the difference is all labor.
Four ways a plumbing bid loses money
01 · The fittings
A percentage where a count was needed
Short branches to fixtures are almost all fittings. A factor based on pipe length misses them in exactly the buildings with the most bathrooms.
What changes
Elbows, tees, wyes and reducers are counted by type and size on the plans, each on its own line.
02 · The underground
Below-grade pipe priced as above-grade
Underground waste and storm need trenching, bedding and backfill, and different material. Mixed in with the above-grade runs, that cost disappears.
What changes
Below-grade and above-grade pipe are separate lines, with trenching and backfill carried for the underground.
03 · The risers
Vertical pipe the floor plan does not show
Stacks between floors, drops to fixtures and vents through the roof add length that a plan-view measurement misses.
What changes
Riser diagrams are read with the plans and vertical runs are added floor by floor.
04 · The schedule
Fixtures counted from the schedule, not the plans
The schedule lists a fixture type once. The plans show how many there are, and in a building of repeated units a small difference multiplies.
What changes
Fixtures are counted on the plans unit type by unit type, then checked against the schedule.
Then and now
What has changed in plumbing estimating
Plumbing used to be estimated with a scale rule, a fixture count and a factor for fittings. Four things have changed that.
Pipe materials have multiplied
Copper, CPVC, PEX, cast iron, PVC and stainless press systems each have their own fittings, joining method and labor. The material named in the specification changes the estimate more than the length does.
Copper and resin prices move
Pipe and fitting prices have been volatile in recent years. Keeping quantities apart from prices lets a bid be repriced on the day it goes in.
Codes added scope
Water-efficiency rules, hot-water recirculation, backflow prevention and condensate disposal are now routine. Each adds pipe, valves and devices that older unit costs leave out.
Fittings are counted on screen
Each fitting is marked on the PDF in a color for its type and size. The count that used to be a percentage is now a number that can be checked against the drawing.
Real plumbing work
Sample plumbing takeoffs and estimates
Pages from one finished job: the plumbing for a four-story hotel in Florida of about 80,500 square feet. Client names, addresses and title blocks are removed; the quantities are as delivered. Click any page to enlarge.
Underground
Underground plumbing takeoff: waste, storm, condensate and gas
Protects you fromUnderground pipe priced without its trench.
Floor plan
Plumbing pipe and fitting takeoff by diameter on a typical floor
Protects you fromOne floor's quantities multiplied for floors that differ.
Unit rough-in
Guest unit rough-in takeoff with pipe and fittings by size
Protects you fromFittings covered by a percentage of the pipe.
Priced estimate
Priced plumbing estimate with labor and material for every line
Protects you fromA lump sum you cannot reprice when copper moves.
Every estimate is built to the client's own specification, so yours may be laid out differently. To see a past project in your own trade, ask for an example. Examples are finished work for other projects, not an estimate of yours; for pricing on your own job, send the drawings for a free quote.
A real plumbing estimate
Plumbing cost breakdown for a four-story hotel
The summary of one finished plumbing estimate: a four-story hotel in Florida of 80,548 square feet.
Plumbing trade cost came to $872,111, or $10.83 per square foot, and general requirements added $160,030. With overhead and profit, insurance, contingency and tax the suggested bid was $1,447,495. The estimate ran to more than 40 sections, from cold water pipe and fittings through storm drainage, gas piping, fixtures, water heaters and trenching.
Figures are from the delivered estimate, rounded to the dollar. They are specific to that project and are shown to illustrate how a plumbing estimate is built up, not as a price guide.
Real jobs, not a price list. Each figure comes from one project, priced for its own ZIP code and that client's wages, overhead and profit. Prices change by region and over time. Yours will be priced for your location.
| Item | Cost | Per sq ft |
|---|---|---|
| General requirements | $160,030 | $1.99 |
| Plumbing (Division 22) | $872,111 | $10.83 |
| Trade cost | $1,032,141 | $12.81 |
| Overhead and profit | $309,642 | $3.84 |
| Insurance | $30,964 | $0.38 |
| Contingency | $51,607 | $0.64 |
| Tax | $23,140 | $0.29 |
| Suggested bid | $1,447,495 | $17.97 |
Building somewhere else? See figures from jobs in Texas, California, Florida and other service areas.
Full sample
Read a full sample, page by page
Plumbing, from a finished job: a three-story apartment building, 30,900 sq ft in Florida. Open it full screen, scroll through all 6 pages and zoom in on any line.
This is one real job, shown as an example. It was built to that client's own specification: their wage rates, labor style, type of pricing, and overhead and profit. Prices also change by region and over time, so yours will be priced for your location.
Want a current sample in your own trade or specialty, or have a question? Use the contact form, email [email protected] or call (832) 356-4237.
Who it is for
Plumbing estimating for contractors, general contractors and suppliers
Plumbing contractors
Pipe, fittings and fixtures counted and priced for each bid, in your labor units and your format.
MEP estimatingMechanical contractors
Plumbing and HVAC taken off together where you carry both, with each trade kept as its own estimate.
Commercial estimatingGeneral contractors
An independent Division 22 number to check a plumbing quote, or to carry when none comes in.
GC estimatingPlumbing suppliers
Quantities only: pipe and fittings by material and size, fixtures by type, limited to what you sell.
Supplier takeoffs
Plumbing scopes we take off
- Domestic cold water
- Domestic hot water and recirculation
- Sanitary waste
- Vent piping
- Storm drainage and roof drains
- Condensate drains
- Natural gas piping
- Underground plumbing
- Fixtures and trim
- Water heaters and equipment
- Pipe insulation
- Cleanouts, drains and valves
Pricing data
Where the prices come from
Quantities are priced from our own pricing database, built with local vendors across the United States. The estimator enters the project's ZIP code and gets current material prices for that market.
Material prices change from region to region and from month to month, so a price book or a national average is out of date before the bid goes in.
Priced by ZIP code
Current local material prices for the place the job is built, not a national average.
Updated by vendors
Local vendors update their prices in the database as they change.
Labor as you bid it
Union, open shop, or Davis-Bacon and prevailing wage rates with fringes.
How it works
From plumbing drawings to a finished estimate
Send the drawings
Plumbing plans, riser diagrams, fixture and equipment schedules, the Division 22 specification and addenda, plus your own labor units or template.
Free quote
We review the set and reply with a quote and a delivery date, usually within about 20 minutes.
Measure, count, price and two QA reviews
Pipe is measured by system and diameter; fittings and fixtures are counted. A separate QA team checks the quantities against the plans and schedules, then the priced estimate.
Delivery, addenda and revisions
The package typically arrives within 24 to 48 hours. Addenda and revisions are free, with no limit and no time limit, and are handled on priority.
The work is done in-house by more than 20 estimators, typically with 7 to 10 years of industry experience.
What it costs
Plumbing estimating prices
- Single project
- From $199. Simple scopes typically run $100 to $250.
- Larger buildings
- Typically $200 to $500. Large or complex plumbing packages are quoted individually.
- Monthly plan
- From $1,499 for 10 to 15 projects, for plumbing contractors who bid every week.
Every job is quoted individually from the drawings, and the quote is free. See all pricing
After delivery
An editable Excel workbook and free revisions
- Formulas built in
An Excel workbook you can change yourself
The estimate arrives as an editable Excel workbook with the formulas built in. Change a quantity, a rate or a markup and every total follows. Move overhead and profit from 25% to 30% and the whole bid recalculates on the spot.
- No waiting
Adjust your bid at the last minute
If something changes just before the deadline, you do not have to send the estimate back and wait. Open the workbook, change the number and submit. The control stays with you.
- Priority turnaround
Free revisions, with no limit
Addenda, scope changes and pricing updates are all free, however many times you come back, and there is no time limit. Revisions are handled on priority and typically come back within an hour to a few hours.
Questions
Plumbing estimating FAQ
It is the takeoff and pricing of a building's plumbing systems. Pipe is measured by system, material and diameter, fittings and fixtures are counted, valves, insulation and equipment are added, and labor hours and material prices are applied to produce an estimate a plumbing contractor can bid from.
Domestic hot and cold water, sanitary waste and vent, storm drainage, condensate and gas piping, each by diameter and split into above and below grade, with fittings, valves, cleanouts, drains, insulation, fixtures and water heaters. Trenching and backfill are carried for underground runs.
Yes. Elbows, tees, wyes, reducers and couplings are counted by type and size and listed on their own lines. In two hotel guest rooms we took off, about 250 feet of half-inch water pipe came with 50 ninety-degree elbows, which is why fittings are counted and not covered by a percentage.
Division 22 Plumbing. Fire sprinkler work is Division 21 Fire Suppression and can be included where it is on the drawings; HVAC piping is Division 23.
Yes. Below-grade and above-grade pipe are separate lines for each system, because the material, the labor and the trenching are different.
A single project starts at $199, and simple scopes typically run $100 to $250. Larger buildings typically run $200 to $500, and large or complex plumbing packages are quoted individually. The quote is free and usually comes back in about 20 minutes.
It depends heavily on the building. On one four-story hotel we estimated, plumbing trade cost was $10.83 per square foot before general requirements and markups. Buildings with a bathroom in every unit cost far more per square foot than offices or warehouses.
Yes. This page shows a full sample from a finished job (plumbing, for a three-story apartment building, 30,900 sq ft in Florida), which you can open full screen and read page by page. It was built to that client's own specification, so the wage rates, pricing and overhead and profit are theirs. Ask us for a current sample in your own trade.
From our own pricing database, built with local vendors across the United States. An estimator enters the project's ZIP code and gets current material prices for that market, and vendors update their prices as they change. Labor is priced as union or open shop, or at Davis-Bacon rates with fringes on government work.
Yes. The estimate is delivered as an editable Excel workbook with the formulas built in. Change any quantity, rate or markup and the whole estimate recalculates. If overhead and profit was set at 25% and you want 30%, change that one cell and every total updates, so you can adjust your number minutes before the bid is due without sending it back to us.
As many as you need. Every revision is free, including addenda, scope changes and pricing updates, however many times you come back, and there is no time limit. Revisions are handled on priority and are typically returned within an hour to a few hours, depending on the size of the change.
Yes. Every estimate is built to the client's own specification. Send your labor units, material pricing or a past estimate and the package is returned that way. You can also order quantities only and price them yourself.
Because counting fittings across a full plumbing set is slow, exact work that a busy contractor rarely has hours for in bid week. Outsourcing gives a plumbing contractor a counted, checked estimate in a day or two and lets them bid more jobs with the same staff.
Related services and service areas
Have a plumbing bid due? Send the drawings.
Free quote in about 20 minutes. Plumbing takeoffs and estimates typically in 24 to 48 hours, built to your format, with free addenda and unlimited free revisions. Based in Houston and estimating plumbing in all 50 states.