In short

CPM scheduling builds a Critical Path Method program showing every activity, its duration, its logic links, and the float available before the completion date moves. MassBid produces baseline schedules, resource-loaded programs, look-aheads and delay analysis in Primavera P6 and MS Project, aligned to your cost estimate.

Software
Primavera P6, Microsoft Project
Deliverables
Baseline, look-ahead, resource loading, updates
Use cases
Owner submittals, progress updates, delay analysis
Pairs with
Your MassBid cost estimate
Turnaround
Project-dependent, quoted up front

Overview

Schedules that hold up in the field

A good estimate deserves a schedule that matches it. Our CPM scheduling services use the Critical Path Method and Primavera P6 to build realistic, resource-loaded schedules that keep construction projects on track from mobilization through closeout.

We develop clear activity sequences, identify the critical path, and highlight the milestones and constraints that actually drive your timeline. Whether you need a baseline schedule for a bid, an update mid-project, or timeline planning alongside your estimate, our scheduling keeps teams aligned and projects moving.

Ready to bid?

Send your plans, get a free quote in ~20 minutes.

Email drawings and scope to our estimators. No obligation, and revisions are free with no limit.

Request an EstimateCall (832) 356-4237

Scope

Scheduling services

  • Baseline CPM schedules
  • Primavera P6 development
  • Critical-path analysis
  • Resource and cost loading
  • Schedule updates and revisions
  • Milestone planning
  • Look-ahead schedules
  • Delay and recovery analysis
  • 4D schedule integration
Realistic critical-path schedules

Realistic critical-path schedules

We build activity sequences and identify the critical path so your team knows exactly which tasks drive the finish date, and where the float actually is.

Primavera P6 expertise

Primavera P6 expertise

Schedules are developed in Primavera P6 to industry standards, ready for owner submission, bid requirements, or day-to-day project control.

Estimating and scheduling together

Estimating and scheduling together

Because we produce both your estimate and your schedule, cost and time stay aligned: resource-loaded schedules that reflect the same scope your estimate is built on.

What you receive

Every estimate package includes

  • Baseline CPM schedule in Primavera P6
  • Critical-path identification and float analysis
  • Activity sequencing with logic and durations
  • Resource and cost loading where required
  • Milestone and constraint mapping
  • Look-ahead schedules for field use
  • Schedule updates and revisions
  • Owner- and bid-ready schedule formats
  • Delay and recovery analysis on request

After delivery

An editable Excel workbook and free revisions

  • Formulas built in

    An Excel workbook you can change yourself

    The estimate arrives as an editable Excel workbook with the formulas built in. Change a quantity, a rate or a markup and every total follows. Move overhead and profit from 25% to 30% and the whole bid recalculates on the spot.

  • No waiting

    Adjust your bid at the last minute

    If something changes just before the deadline, you do not have to send the estimate back and wait. Open the workbook, change the number and submit. The control stays with you.

  • Priority turnaround

    Free revisions, with no limit

    Addenda, scope changes and pricing updates are all free, however many times you come back, and there is no time limit. Revisions are handled on priority and typically come back within an hour to a few hours.

Questions

CPM scheduling services: common questions

Critical Path Method scheduling maps out project activities, their logic, and durations to identify the sequence of tasks that determines the project's finish date.

Yes. We develop schedules in Primavera P6 to industry standards, suitable for owner submission and day-to-day project control.

Yes. We build baseline CPM schedules for bid requirements as well as updates and look-aheads once the project is underway.

Yes. We can perform delay and recovery analysis to support schedule updates, claims, and recovery planning.

Absolutely. Producing both keeps cost and time aligned, with resource-loaded schedules built on the same scope as your estimate.

Still have questions?

Our estimators are happy to walk through your scope.

Contact us

Send us your plans today

Free quote in ~20 minutes. Complete estimate in 24 to 48 hours. Free revisions with no limit.