CSI MasterFormat divisions explained, with real estimates for each

The divisions that organize every specification and estimate, what each one covers, and a real sample for most of them.

By the MassBid Estimation team · Published · Updated

In short

CSI MasterFormat is the standard system for organizing construction specifications and cost estimates in the United States and Canada. It sorts all the work on a project into 50 numbered divisions, 00 to 49, such as 03 Concrete, 09 Finishes and 26 Electrical. Estimators use the same divisions so that an estimate lines up with the specifications and the bid form.

Published by
The Construction Specifications Institute and Construction Specifications Canada
Number of divisions
50, numbered 00 to 49, with several held in reserve
Before 2004
16 divisions
Building work
Divisions 02 to 14
Mechanical and electrical
Divisions 21 to 28
Site work
Divisions 31 to 33

What MasterFormat is for

A set of construction documents has two halves: the drawings, which show where things go, and the specifications, which say what they are made of and how they are installed. MasterFormat is the filing system for the specifications. Every product and trade has a home, identified by a six-digit number whose first two digits are the division.

Because architects, contractors, suppliers and estimators all use it, a subcontractor can open any project manual and find their work in the same place. An estimate laid out the same way can be checked against the specifications section by section.

The 2004 edition expanded the system from 16 divisions to 50, mainly to give mechanical, electrical, communications and site work more room.

The divisions used on most buildings

CSI MasterFormat divisions used on most building projects and what each covers
DivisionCovers
00 Procurement and Contracting RequirementsBid forms, instructions to bidders, contract conditions
01 General RequirementsSupervision, temporary facilities, permits, cleaning, closeout
02 Existing ConditionsDemolition, site assessment, hazardous material removal
03 ConcreteFormwork, reinforcing, cast-in-place and precast concrete
04 MasonryBrick, concrete block, stone, mortar and grout
05 MetalsStructural steel, joists, deck, stairs, railings, miscellaneous metals
06 Wood, Plastics and CompositesRough framing, sheathing, trusses, finish carpentry, millwork
07 Thermal and Moisture ProtectionRoofing, insulation, waterproofing, flashing, sealants, firestopping
08 OpeningsDoors, frames, hardware, windows, storefront, curtain wall, glazing
09 FinishesDrywall, ceilings, flooring, tile, paint, wall coverings
10 SpecialtiesToilet accessories, signage, lockers, fire extinguishers
11 EquipmentKitchen, laboratory, medical and other fixed equipment
12 FurnishingsCasework, window treatments, furniture
13 Special ConstructionPools, pre-engineered structures, special rooms
14 Conveying EquipmentElevators, escalators, lifts
21 Fire SuppressionSprinklers, standpipes, fire pumps
22 PlumbingPiping, fixtures, water heaters, drains
23 HVACDuctwork, air handling, heating and cooling equipment, controls
25 Integrated AutomationBuilding automation systems
26 ElectricalPower distribution, wiring, devices, lighting
27 CommunicationsData, voice, audio-visual cabling
28 Electronic Safety and SecurityFire alarm, access control, video surveillance
31 EarthworkClearing, excavation, grading, fill, shoring
32 Exterior ImprovementsPaving, curbs, sidewalks, fencing, landscaping
33 UtilitiesWater, sewer, storm drainage, site electrical and gas

Divisions 34 and 35 cover transportation and marine construction. Divisions 40 to 48 cover process and industrial equipment, such as material handling, water and wastewater treatment and power generation. The numbers in between are held in reserve.

How divisions appear in an estimate

An estimate summary lists one line for each division that has work in it. On an 8,020 square foot interior renovation we estimated, twelve divisions appeared: 01, 02, 06, 08, 09, 10, 11, 12, 22, 23, 26 and 27. There was no Division 03 or 05, because an interior fit-out pours no concrete and erects no steel.

That is the first thing to check on any estimate: do the divisions listed match the trades in the drawings? A missing division usually means a missing trade. The full breakdown of that estimate is in how to read a construction estimate.

Real samples, division by division

We estimate every division, and the samples page has at least one finished estimate or takeoff for each of Divisions 01 to 12, 21 to 23, 26 to 28 and 31 to 33. A few examples:

Sample estimates by CSI division, with the building and the trade cost
DivisionSample projectFigure
02 Existing ConditionsEducation building, Maryland, 8,260 sq ft$57,620 suggested bid
03 ConcreteMulti-story building, California$846,899 concrete
05 MetalsRetail store addition, Florida, 5,155 sq ft$160,679 metals
08 OpeningsEquipment rental building, North Carolina, 10,500 sq ft$89,144
09 FinishesCity recreation center, Texas, 11,500 sq ft$86,873 flooring
22 PlumbingThree-story apartment building, Florida, 30,900 sq ft$882,592 plumbing
23 HVACFour-story hotel, Florida, 80,500 sq ft$764,512 HVAC
26 ElectricalApartment building, California, 12,200 sq ft$238,337 electrical
31 EarthworkChildcare center site, Texas$140,732
32 Exterior ImprovementsCity road and roundabout, Florida$538,980 paving
Each sample was built to that client's own specification, so wage rates, prices and markups differ from one to the next.

Common questions

MasterFormat has 50 divisions, numbered 00 to 49. Several are held in reserve for future use, so fewer than 50 are in active use. Before 2004 there were 16.

General Requirements: costs that belong to the project but not to one trade, such as supervision, temporary facilities, permits, cleaning and closeout.

Division 09, Finishes. It also covers ceilings, flooring, tile, paint and wall coverings.

Division 23. Plumbing is Division 22, fire suppression is Division 21 and electrical is Division 26.

Division 31 Earthwork, Division 32 Exterior Improvements and Division 33 Utilities. Demolition of existing structures is in Division 02.

Yes. Every estimate is organized by MasterFormat division, with a summary line for each division and a detail sheet behind it, unless you ask for your own format.