Skip to main content

Loading

Guide

Construction cost per square foot by city in 2026

Published cost ranges for 15 US cities and five building types, and what real trades cost per square foot on jobs we estimated.

By the MassBid Estimation team · Published · Updated

In short

Across the 15 US cities listed here, published construction costs for multifamily buildings in the second quarter of 2026 ranged from $185 to $275 per square foot in Austin to $420 to $700 in San Francisco. Warehouses ran from $75 to $150 per square foot in Dallas and Austin to $190 to $260 in Seattle. These are hard construction costs for whole buildings from Rider Levett Bucknall's quarterly report; a real bid needs quantities measured from the drawings.

Source
Rider Levett Bucknall, North America Quarterly Construction Cost Report, Q2 2026
Measure
Hard construction cost per square foot of gross floor area
Lowest multifamily range
Austin, $185 to $275
Highest multifamily range
San Francisco, $420 to $700
Lowest warehouse range
Austin and Dallas, $75 to $150
Highest hospital figure
San Francisco, up to $1,500

Cost per square foot in 15 US cities

The table shows low and high cost per square foot for five common building types. The figures are a cost consultant's published ranges, not our estimates.

Published construction cost ranges per square foot in 15 US cities for five building types, second quarter 2026
CityOffice, primeHospitalWarehouseMultifamilyElementary school
Austin$255–$425$480–$680$75–$150$185–$275$280–$395
Boston$460–$725$625–$1,200$135–$225$290–$390$635–$750
Charlotte$360–$600$710–$985$130–$210$215–$365$335–$490
Chicago$355–$580$455–$925$155–$245$220–$490$320–$480
Dallas$260–$435$485–$695$75–$150$190–$280$285–$405
Denver$350–$575$700–$1,000$140–$225$225–$400$375–$525
Las Vegas$285–$505$570–$680$80–$175$215–$510$465–$580
Los Angeles$275–$415$705–$1,070$145–$225$270–$440$420–$550
Miami$260–$445$505–$715$80–$155$190–$290$295–$415
Nashville$370–$610$725–$1,000$135–$210$215–$375$340–$495
New York$425–$985$655–$1,000$150–$245$255–$500$565–$710
Phoenix$270–$465$530–$745$85–$165$200–$295$300–$435
San Francisco$460–$800$785–$1,500$150–$255$420–$700$700–$1,000
Seattle$380–$675$665–$940$190–$260$290–$495$460–$690
Washington, DC$350–$580$535–$950$135–$220$220–$370$400–$610
Hard construction cost in US dollars per square foot of gross floor area, second quarter of 2026. Source: Rider Levett Bucknall, North America Quarterly Construction Cost Report, Q2 2026. Ranges vary with site conditions, specification and market conditions.

What these figures include and leave out

Hard construction cost is the cost of building the building: structure, envelope, interiors, mechanical and electrical systems, and the contractor's general conditions and fee. It normally leaves out land, design fees, permits and impact fees, financing, furniture and equipment, and the owner's own costs.

The spread between low and high is wide for a reason. A warehouse in the same city can cost twice as much per square foot if it is small, refrigerated, or on a difficult site.

What single trades cost on real jobs

Whole-building ranges are useful for budgets. For a bid you need the cost of each trade, and that swings far more. These are trade costs from estimates we delivered, per square foot of building:

Trade costs per square foot of building from estimates delivered by MassBid Estimation
Project and tradeTrade costPer sq ft
Bank branch, Charlotte, 2,860 sq ft: glazing$230,886$80.81
Apartment building, Boston, 13,300 sq ft: plumbing$1,036,815$78.20
Restaurant, Northern Virginia, 3,890 sq ft: HVAC$143,559$36.87
Hotel, Atlanta, 60,500 sq ft: glazing$536,080$8.86
Hotel, northern Illinois, 67,400 sq ft: roofing$276,069$4.10
Mixed-use building, Boston, 121,100 sq ft: painting$297,033$2.45
Grocery store, Georgia, 100,200 sq ft: glazing$139,724$1.39
Trade cost before overhead, profit, contingency and tax. Specific to those projects and not a price guide.

Glazing alone runs from $1.39 to $80.81 per square foot of building in that list. That is why a square-foot allowance for a trade is risky, and why we count frames, fixtures and feet of pipe.

Why costs differ between cities

  • Labor. Wage rates, union density and how busy the market is. This is the largest difference between cities.
  • Codes and climate. Seismic design in California, hurricane design in Florida, frost depth and snow in the north, energy codes everywhere.
  • Site logistics. A dense city adds hoisting, street permits and deliveries by appointment.
  • Materials. Local supply, freight distance and sales tax.

We price every project to its own ZIP code for those reasons. City pages with local jobs and costs: Houston, Dallas, Los Angeles, New York City, Chicago, Boston, Atlanta, Charlotte, Nashville and Miami.

How to use cost per square foot

  • Use it to test a budget early, before drawings exist.
  • Use it to check a finished estimate: if the total falls far outside the range, find out why.
  • Do not bid from it. Two buildings of the same size and type can differ by a factor of two.

For a budget at concept or schematic stage, see preliminary estimating. For a bid, send the drawings and we will measure them. Get a free quote.

Common questions

There is no single figure, because cost depends on the building type and the city. In the second quarter of 2026, published ranges for multifamily buildings ran from $185 to $275 per square foot in Austin to $420 to $700 in San Francisco, according to Rider Levett Bucknall.

In Rider Levett Bucknall's second quarter 2026 report, San Francisco has the highest or near-highest ranges for most building types, including $420 to $700 per square foot for multifamily and $785 to $1,500 for hospitals. New York and Boston are also near the top.

Among the 15 cities in this guide, published second quarter 2026 ranges run from $75 to $150 per square foot in Austin and Dallas to $190 to $260 in Seattle.

Published second quarter 2026 ranges for multifamily run from $185 to $275 per square foot in Austin, $220 to $490 in Chicago and $255 to $500 in New York, up to $420 to $700 in San Francisco.

No. These are hard construction costs: the cost of building the building. Land, design fees, permits, financing and furniture are separate.

It is not safe to. Square-foot figures are for budgets and for checking totals. A bid needs quantities measured from the drawings and priced for the project's ZIP code.

Sources

Send your plans, get an exact price

Free quote in about 20 minutes. Estimates typically in 24 to 48 hours, with free revisions.